Wave buoy location | 54° 30.27' N 000° 36.41'W |
WMO code | 6201046 |
Approx. water depth | 17 m CD |
Approximate spring tidal range | 4.6 m |
Storm alert threshold | 4.16 m |
Wave parameters are recorded using a Datawell Directional WaveRider Mk III buoy. The buoy was deployed on 18 January 2013, at which time the magnetic declination at the site was 1.8° west, changing by 0.18° east per year. Wave direction is reported following the nautical convention, meaning that the direction is where the waves come from, measured clockwise from magnetic north.
03/08/2024 | Scheduled service |
29/01/2024 | Scheduled service |
24/01/2023 | The buoy was redeployed. |
19/08/2022 | Communication with the buoy was lost. A fault with the HF antenna is suspected, the buoy has been recovered to the harbour. The buoy will be redeployed at the earliest opportunity. |
05/05/2022 | The buoy was redeployed. |
10/04/2022 | The buoy was sent adrift and will be recovered asap. |
25/03/2022 | The buoy was redeployed. |
29/11/2021 | The buoy was located, badly damaged, east of East Pier in Whity. The buoy will be recovered and a replacement buoy deployed at the earliest opportunity. |
27/11/2021 | Communication with the buoy was lost in the extreme waves caused by Storm Arwen. Updates to follow. |
19/07/2021 | The buoy was redeployed |
10/07/2021 | The buoy went adrift and was recovered the same day. The instrument will be redeployed ASAP. |
13/05/2021 | Scheduled service |
06/11/2020 | The buoy was redeployed |
24/09/2020 | The buoy was sent adrift and was recoverd. It is currentlie tied up in Whitby Harbour. |
17/06/2020 | The buoy was redeployed |
04/06/2020 | The was was sent adrift and beached |
25/04/2020 | The buoy was redeployed |
17/02/2020 | The buoy was cut adrift |
12/09/2019 | The buoy has been redeployed |
08/07/2019 | The wave buoy parted from its mooring but was recovered. It is currently tied up in Whitby Harbour. |
17/12/2018 | A replacement buoy has been deployed |
26/10/2018 | The buoy came off its mooring but found its way to Whitby Harbour. It is currently tied up in the harbour in calm waters. |
31/08/2018 | Scheduled service |
12/01/2018 | Scheduled service |
25/08/2011 | Buoy swapped |
07/08/2017 | Scheduled service |
23/06/2016 | Buoy swapped out today |
12/03/2016 | Scheduled service |
20/10/2015 | Buoy re-deployed |
07/10/2015 | Buoy has come adrift; recovery efforts are underway |
23/07/2015 | Buoy re-deployed |
17/05/2015 | Buoy set adrift again |
13/05/2015 | Buoy re-deployed |
08/05/2015 | Buoy has come adrift. Will be recovered ASAP |
27/01/2015 | Scheduled service |
25/06/2014 | The buoy has come adrift again, and was kindly towed to harbour by a local fishing vessel |
12/05/2014 | Buoy re-deployed. |
05/05/2014 | Buoy has come adrift. Will be redeployed as soon as possible |
17/02/2014 | Last nights' data gap was caused by an issue experienced at the shore station computer |
17/11/2013 | Buoy came adrift this morning but was moved back to licenced position this evening and checked for damage |
21/06/2013 | Buoy re-deployed |