Wave buoy location | 53° 03'.49N 000° 28'.53E |
WMO code | 62041 |
Approximate water depth | 31 m |
Approximate spring tidal range | 6.25 m |
Storm alert threshold | 2.20 m |
Wave parameters are recorded using a Datawell Directional WaveRider Mk III buoy. The buoy was deployed on 25 September 2006, at which the magnetic declination at the site was 2.20° West, changing by 0.15° East per year. Wave direction is reported following the nautical convention, meaning that the direction is where the waves come from, measured clockwise from magnetic north.
18/01/2025 | Scheduled service |
04/10/2024 | The buoy was serviced and redeployed. |
20/09/2024 | The buoy was set adrift. It has been recovered and will be redeployed as soon as possible. |
05/07/2024 | Scheduled service. Data displayed from 01-05 July was measured in Hull marina. |
25/02/2024 | Scheduled service |
09/10/2023 | The buoy has been redeployed. Data will update on the website on 11/10/23. |
02/10/2023 | The buoy has come adrift. It has been recovered and will be redeployed at the next available opportunity. |
11/09/2023 | Scheduled service |
25/05/2023 | Scheduled service |
24/08/2022 | Scheduled service |
24/03/2022 | Scheduled service |
06/09/2021 | Scheduled service |
15/03/2021 | The buoy was redeployed and serviced. |
08/03/2021 | The buoy was set adrift. |
07/07/2020 | Scheduled service |
31/10/2019 | Scheduled service |
04/09/2019 | The shore station was visited to install a new computer. The old one was likely damaged by a lightning strike. |
03/09/2019 | The buoy was redeployed. |
01/09/2019 | The buoy was set adrift and recovered the same day. |
03/06/2019 | Shore station visited to check antenna and position. Plans are being implimented to improve HF telemetry. |
12/05/2019 | Scheduled service |
21/01/2019 | Scheduled service |
29/11/2018 | The shore station was visited to enable HF transmission. |
07/07/2018 | The buoy was redployed and serviced. |
13/06/2018 | The buoy was sent adrift and recovered the same day. |