National Network of Regional Coastal Monitoring Programmes
« Return to map for other wave, tide and met stations.
Note that these are real-time data and are not quality-controlled. Long-range graphs are plotted from a randomised subsample of half-hourly data.
Happisburgh
Additional Information
| Wave buoy location | 52° 49'.58N 001° 32'.97E |
| WMO code | 6201051 |
| Approximate water depth | 10 m |
| Approximate spring tidal range | 2.6 m |
| Storm alert threshold | 2.66 m |
| Meteorological station location | 52° 48'.80N 001° 33'.37E |
Wave parameters are recorded using a Datawell Directional WaveRider Mk III buoy. The buoy was deployed on 04 September 2012, at which time the magnetic declination at the site was 0.83° West, changing by 0.17° East per year. Wave direction is reported following the nautical convention, meaning that the direction is where the waves come from, measured clockwise from magnetic north.
| 04/09/2025 | Scheduled service of the met station. |
| 13/04/2025 | Scheduled service |
| 29/01/2025 | Scheduled service of the met station. |
| 04/02/2025 | An area wide powercut caused the met station to go offline. A manual restart is required. |
| 30/10/2024 | Scheduled service |
| 27/09/2024 | The met station computer needs to be replaced. A site visit will take place as soon as feasible. The computer was replaced on 30/10/2024 |
| 29/08/2024 | Scheduled service of the met station. |
| 11/05/2024 | Scheduled service |
| 26/03/2024 | Scheduled service of the met station. |
| 08/09/2023 | The buoy was serviced and redeployed. |
| 03/08/2023 | Scheduled service of the met station. |
| 29/06/2023 | They buoy has been recovered temporarily due to an ongoing geophysical survey in the immediate area. The buoy will be redeployed as soon as possible. |
| 28/04/2023 | Communications from the met station have been interrupted, an investigation is underway. |
| 14/11/2022 | Scheduled service |
| 30/08/2022 | Scheduled service of the met station. |
| 29/06/2022 | The buoy was switched to Iridium at midnight. |
| 20/05/2022 | Scheduled service of the DWR. |
| 04/02/2022 | Scheduled service of the met station. |
| 08/12/2021 | The buoy will be switched to iridium at midnight tonight. |
| 07/12/2021 | The receiver station for the buoy is offline due to a major BT service outage. Remedial works are ongoing and expected to be completed by 09:00 on Friday 10 December. |
| 13/08/2021 | Scheduled service |
| 02/03/2021 | Scheduled service |
| 26/09/2020 | The shore station has suffered a power cut. Repairs are scheduled for the weekend. |
| 17/07/2020 | Scheduled service |
| 12/01/2020 | Scheduled service |
| 26/11/2019 | A BT engineer has attended the site to upgrade to fibreoptics. The line speed has increased greatly since. |
| 05/09/2019 | Shore statoin visited to install a new computer. |
| 19/06/2019 | The buoy was swapped serviced to remedy a break in the HF antenna. |
| 04/06/2019 | Shore station visited to enable remote power cycling of the router. |
| 14/05/2019 | Shore station visited to replace RXC. |
| 22/03/2019 | Scheduled service |
| 30/11/2018 | Shore station visited to enable HF communication. |
| 15/08/2018 | Scheduled service |
