National Network of Regional Coastal Monitoring Programmes
« Return to map for other wave, tide and met stations.
Note that these are real-time data and are not quality-controlled. Long-range graphs are plotted from a randomised subsample of half-hourly data.
Seaford
Additional Information
Wave buoy location | 50° 45.99' N 000° 04.53' E |
WMO code | 6201014 |
Approximate water depth | 11 m CD |
Approximate spring tidal range | 6.1 m |
Storm alert threshold | 3.78 m |
Wave parameters are recorded using a Datawell Directional WaveRider Mk III buoy. The buoy was deployed on 22 January 2008, at which time the magnetic declination at the site was 1.8° west, changing by 0.14° east per year. Wave direction is reported following the nautical convention, meaning that the direction is where the waves come from, measured clockwise from magnetic north.
13/09/2024 | Scheduled service |
17/06/2024 | The shore station has been brought back online. |
24/05/2024 | The buoy was swapped out following reports that the antenna light had stopped working. The shore station remains offline. |
08/05/2024 | The BT line for the shore station was severed while a power cable was being laid. A site visit by a BT engineer is scheduled. |
22/04/2024 | The buoy is offline due to issues at the shore station. An investigation is underway. |
20/03/2024 | Scheduled service |
30/12/2023 | The buoy is offline due to power issues at the shore station. |
24/06/2023 | Scheduled service |
31/05/2023 | The shore station is experiencing power issues again. |
13/05/2023 | The shore station is experiencing power issues again. |
01/05/2023 | There is a power outage at the shore station. |
23/01/2023 | Scheduled service |
12/11/2022 | There are further power issues at site, the buoy will be online again as soon as this is rectified. Update: The power was restored on 21/11/2022. |
09/11/2022 | Local power issues have interrupted transmission again. Update: The connection was restored on 10/11/2022. |
02/11/2022 | Data transmission has been interrupted by a local power outage. Update: The connection was restored on 07/11/2022. |
25/10/2022 | Data is not being received due to a local power outage. Update: The local power outage was resolved and data transmission has resumed. |
13/07/2022 | The HF antenna on the buoy was replaced after reports that the site was unlit. |
23/06/2022 | Scheduled service |
23/09/2021 | Scheduled service |
22/09/2021 | Scheduled service |
28/04/2021 | Scheduled service |
05/11/2020 | Scheduled service |
16/05/2020 | Scheduled service |
19/11/2019 | Scheduled service |
21/06/2019 | Scheduled service |
04/01/2019 | Scheduled service |
08/06/2018 | Scheduled service |
19/12/2017 | Scheduled service |
27/10/2017 | Internet connection has been restored |
26/10/2017 | There is a problem with the internet line at the shore station; engineers have been called |
09/05/2017 | Scheduled service |
20/12/2016 |
The buoy came adrft this morning, the bungee has been severed. A local vessel has kindly receovered the buoy and plans are underway to re-deploy it later today. The buoy was re-deployed at 15:00Z. |
01/12/2016 | Scheduled service |
02/06/2016 | The connection has now been restored and data should backfill to the website. |
30/05/2016 | Internet issues at the shore station are preventing data from being uploaded to the website and are being investigated with BT. The buoy is still on position and transmitting data. |
04/05/2016 | Scheduled service |
13/11/2015 | Data have stopped being uploaded to the website due to an issue at the shore station. Will be fixed ASAP. |
09/10/2015 | Replacement buoy deployed |
03/10/2015 | Scheduled service revealed lower battery than expected. Hull will be swapped ASAP. |
08/05/2015 | The data gap over the past 36 hours was due to another issue with the shore station computer which has now been swapped out again. |
27/04/2015 | The buoy came free from its mooring this morning but has since been recovered and redeployed. The mooring appears to have been cut by a passing vessel. |
18/04/2015 | The computer at the shore station stopped working yesterday and had to be replaced. |
08/04/2015 | Buoy redployed today. |
06/04/2015 | Buoy came adrift this afternoon. Has been recovered and will be redeployed ASAP. |
26/11/2014 | Scheduled service |
31/05/2014 | Scheduled service |
17/03/2014 | Unscheduled check on buoy and HF antenna replaced |
14/03/2014 | Buoy stopped transmitting data due to a faulty antenna; oossibly a result of a vessel impact |
26/11/2013 | Buoy re-deployed |
21/11/2013 | Buoy came adrift from mooring around 11pm last night. The buoy is being tracked but adverse sea conditions prevent recovery at present |
13/11/2013 | Scheduled service |
05/07/2013 | Buoy redeployed |
02/07/2013 | Buoy came adrift at 0040 last night. Appears to have beached near Seaford Head. Will be recovered and redeployed ASAP |
16/05/2013 | Scheduled service |
27/11/2012 | Scheduled service |
03/05/2012 | Scheduled service |
19/01/2012 | Loose wiring affected data until fixed on 21 January |
10/12/2011 | The buoy has been checked and re-deployed |
08/12/2011 | The buoy has come adrift and beached but cannot be reached from the shore. A rescue from the sea is underway, but delayed by rough weather |
20/10/2011 | Scheduled service |
12/01/2011 | No data coming through to the website, fault under investigation |
09/04/2010 | Scehduled service |
26/03/2010 | No data are being received at the shore station. There was a thunderstorm last night which may have caused problems. The fault is under investigation. |
16/11/2009 | The shore station suffered a major power cut during the storms yesterday and no data were received from the buoy from 05:30 15 Nov to 10:00 16 Nov. The data will be recovered from the buoy during the next service visit. |
15/10/2009 | The buoy was replaced by a spare. |
25/08/2009 | Scehduled service |
23/04/2009 | Scheduled service |
10/11/2008 | Buoy has been hit but, settled after a short period of time. |
14/08/2008 | Cut adrift at approx 5:00, recovered and re-deployed. |
31/07/2008 | Buoy re-deployed |
20/06/2008 | Adrift, kindly recovered to Newhaven Harbour by the RNLI. |
05/06/2008 | Mooring severed, re-deployed on the same mooring. |
22/01/2008 | Buoy deployed |